Skip to main content
StampedJaipur Works
Live

Value

Reports & ledger

Confirmed savings (MTD)

₹41,600

Pending utility bill verification

Addressable potential

₹1,95,000

Open modeled + pending value

Export centre

Generate → review → approve → download. External send is blocked until approved.

Approval queue (1)

  • sustainability monthly · Jul 2026

    rep_2026_07

    pending approval
  • sustainability monthly · Jun 2026

    rep_2026_06

    approved
  • brsr pat adjunct · FY26 Q1

    rep_brsr_q1

    approved

Confirmed savings (MTD)

₹41,600

Pending utility bill verification

Addressable potential

₹1,95,000

Shift non-critical HVAC off peak

realised savings · IPMVP Option B · baseline hvac admin 7d

₹11,200

Confirmed by operations

Confirmed from plant data — pending utility bill verification.

Emission factor: CEA grid factor 2024

Replace failed APFC stage 3 capacitor

realised savings · IPMVP Option B · baseline mill 1 pf

₹17,600

Confirmed by operations

Confirmed from plant data — pending utility bill verification.

Emission factor: CEA grid factor 2024

Leak survey — instrument air loop B

realised savings · IPMVP Option A · baseline air loop b

₹12,800

Confirmed by operations

Confirmed from plant data — pending utility bill verification.

Emission factor: CEA grid factor 2024

APFC health check — Cement Mill 1

opportunity cost · counterfactual TOD slab · baseline mill 1 pf

₹38,000

Estimated — pending bill check

Estimated — Delay cost while APFC outage continues. Pending bill check.

Emission factor: Not measured

Shift packing surge outside peak TOD

opportunity cost · tariff band counterfactual · baseline pack tod

₹31,000

Estimated — pending bill check

Estimated — Modeled if packing stays on 18–20 peak. Pending bill check.

Emission factor: CEA grid factor 2024

Compressor demand stagger

realised savings · IPMVP Option B · baseline comp 2 30d

₹18,000

Disputed

Disputed — excluded from confirmed totals until resolved.

Emission factor: CEA grid factor 2024

Defer kiln wash during evening peak

realised savings · IPMVP Option A · baseline kiln wash

₹4,200

Disputed

Disputed — excluded from confirmed totals until resolved.

Emission factor: CEA grid factor 2024