Prescription · Full case
Replace failed APFC stage 3 capacitor
Power factorhighInfoclosedConfirmed by operations· 2026-06-28
Stage outage drove PF penalty exposure in Jun
Potential savings
₹19,000
per month
₹2,28,000 / yr modeled
Root-cause analysis
- Stage outage drove PF penalty exposure in Jun
Recommended action
- Spare bank installed; hold as operations-confirmed until PF appears on bill.
Anomaly window
| Asset | Load % | Comment |
|---|---|---|
| kiln 1 | 108% | Above design |
| mill 1 | 72% | Normal |
| comp 2 | 54% | Normal |
What this shows
Demand 14% above design during 10–11 TOD peak; MD coincidence risk.
Sanity check
Confirm finding against live load for the named assets. Log header pressure, kW, and alarms for 15–30 minutes to validate.
Cost–benefit & ROI
Modeled addressable: ₹19,000/mo based on MD coincidence · peak TOD window.
Spare stage swap
Realised: ₹17,600
KPIs & alerts
| KPI | Target | Alert |
|---|---|---|
| Rule confidence | ≥ 88% | < 78% |
| Action by due date | Closed | Overdue |
Commissioning & verification
- Spare bank installed; hold as operations-confirmed until PF appears on bill.
Ledger entry
Manager takeaway
Replace failed APFC stage 3 capacitor. Stage outage drove PF penalty exposure in Jun Addressable ₹19,000/mo at 88% confidence.