Skip to main content
StampedJaipur Works
Live

Operations

Live

Real-time plant instrumentation · load dials, health map, demand profile, and anomaly feed · A · 06:00–14:00 IST

LIVELive plant data · 1s refresh
Plant demand94.2 MW
Last sync0s ago

Live Instrumentation

Live Anomalies

7

Last triggered 4 min ago

3Critical2Warning2Info

Live Instrumentation

Critical Asset Load Dials

Modbus / OPC-UA · 1s poll
Kiln 1
4,820 kWh/h
Cement Mill 1
PF 0.84
Raw Mill A
Vib 4.2mm/s
Chiller Unit 1
COP 3.3
Compressor 2
AI optimized

Real-Time Health Map

Plant Equipment Status

115 assets
Kiln 1
108%4,820
Kiln 2
91%4,210
Raw Mill A
97%1,840
Raw Mill 2
72%1,690
Cement Mill 1
112%3,940
Cement Mill 2
84%3,560
Compressor 1
79%890
Compressor 2
54%740
Chiller Unit 1
96%1,120
Chiller Unit 2
82%980
Conveyor B1
93%210
Conveyor B2
88%195
Packing Line 1
41%460
Packing Line 2
0%0
HV Transformer
77%
Admin HVAC
38%380
CriticalWarningGoodOptimizedInfoOffline
2 Critical · 3 Warning · 8 Good · 1 Offline · 1 Info · 1 Optimized

TOD Tariff Exposure

24-Hour Demand Profile

Off-peak Shoulder Peak
Current demand 94.2 MW · Peak demand 98 MW at 20:00 · TOD penalty window 18:00–22:00 · AI shifting 280 kW off-peak

Operational Intelligence

Live Anomaly & Alert Feed

Critical
Kiln 1Load 108% — 14% above design. Drawing 4,820 kWh/h. MD coincidence risk in 10–11 TOD peak.
4m ago
Critical
Cement Mill 1PF 0.84 drifting toward penalty slab. Overload sustained >35 min.
11m ago
Warning
Raw Mill AVibration anomaly on main bearing (Z-axis 4.2mm/s, threshold 3.5mm/s).
18m ago
Warning
Chiller Unit 1COP dropped from 4.1 to 3.3. Possible fouling on heat exchanger.
23m ago
Warning
Admin HVACOff-peak schedule drift — still running into morning peak TOD.
41m ago
Info
Conveyor B1Idle energy draw during scheduled break. 93 kWh wasted.
52m ago
Resolved
Compressor 2AI optimization applied. Load reduced from 84% to 54%. Saving ₹1,800/day.
1h ago
Info
Packing Line 2Equipment offline since 05:30. Planned maintenance. Expected restart: 14:00.