Skip to main content
StampedJaipur Works
Live

Sustainability

Intensity, emissions & demand

Jaipur Works · Rajasthan HT industrial TOD

Sustainability & intensity snapshot

SEC, emissions, renewable mix, and demand metrics — with explicit disclosure when data is missing. Nothing is invented for Scope 1 or unmeasured activity.

SEC28.24 kWh/u
Scope 2852 tCO₂e
Renewable6.3%
MD headroom6.4%

SEC trend (kWh per unit)

42,500 production units MTD

Scope 2 emissions trend (tCO₂e)

CEA grid factor 2024

Energy mix

1,280 MWh total · Grid 1,200 MWh

Top consumers (MTD share)

TOD exposure

Off-peak

22:00 – 06:00

5.2/kWh

Normal

06:00 – 10:00

6.8/kWh

Peak

10:00 – 14:00

8.9/kWh

Normal

14:00 – 18:00

6.8/kWh

Peak

18:00 – 22:00

8.9/kWh

Peak share MTD: 34% · CMD 5,000 kVA

Honest disclosure

  • Scope 1 (onsite fuel) — not measured by Stamped in this demo plant.
  • Scope 2 uses CEA grid factor 2024 — bill-verified where available.
  • scope1 activity data
Never invent missing activity data

Contract demand (CMD)

5,000 kVA

Rajasthan HT industrial TOD

Peak MD (billing window)

4,680 kVA

Headroom

6.4%

TOD tariff bands

  • Off-peak

    22:00 → 06:00

    5.2/kWh

  • Normal

    06:00 → 10:00

    6.8/kWh

  • Peak

    10:00 → 14:00

    8.9/kWh

  • Normal

    14:00 → 18:00

    6.8/kWh

  • Peak

    18:00 → 22:00

    8.9/kWh

CMD line is contractual — coincidence risk surfaces on alarms when peak MD approaches CMD.

Some data is unavailable

Showing what we have; missing slices are listed.

  • scope1_activity_data

SEC

28.24 kWh/unit

42,500 units MTD

Renewable share

6.3%

Scope 2

852 tCO₂e

CEA grid factor 2024

Scope 1

Not measured

Disclosure

  • scope1 activity data not available
Never invent missing activity data