Skip to main content
StampedJaipur Works
Live

Operations

Machine Health

Predictive condition monitoring · 115 assets · live load dials · vibration & thermal trends

Fleet Health Index

74/100
+2.3

Assets At Risk

16
-12

Predictive Alerts

9
+4

Avg MTBF

248d
+6.1 d

Maint. Compliance

92%
+3.4pp

Unplanned Downtime

1.8%
-0.6pp

Live Instrumentation

Asset Load Dials — Full Fleet

Modbus / OPC-UA · 1s poll

Asset Detail

Kiln 1

Critical
58
Rotary Kiln · Clinkerization
Next service: Overdue 3d
Runtime: 7,820 h · MTBF 142d
Load
108%
Vibration
4.8 mm/s
Temperature
412°C
Current
685 A

Predictive · 24h

Vibration Trend (mm/s)

Spectral

Vibration FFT — Cement Mill 1

Bearing defect freq detected

Thermal · 24h

Temperature Trend

Fleet

Health Distribution

Healthy (80-100)71
Watch (60-79)28
At Risk (<60)16

Condition Register

Asset Health Register

AssetTypeSectionHealthLoadVibTempRuntimeNext ServiceStatus
Kiln 1Rotary KilnClinkerization58108%4.8412°7.8k hOverdue 3dCritical
Kiln 2Rotary KilnClinkerization8891%2.1388°6.4k hin 41dGood
Raw Mill AVertical MillRaw Grinding7197%4.296°5.1k hin 6dWarning
Raw Mill BVertical MillRaw Grinding9088%1.888°5.0k hin 52dGood
Cement Mill 1Ball MillGrinding52112%5.6104°8.2k hOverdue 1dCritical
Cement Mill 2Ball MillGrinding8684%2.492°5.6k hin 33dGood
Compressor A1Screw CompressorUtilities8279%274°3.1k hin 28dGood
Compressor A2Screw CompressorUtilities9471%1.468°3.0k hin 60dOptimized
Chiller Unit 1Centrifugal ChillerUtilities6796%3.112°4.4k hin 9dWarning
Air CompressorRecip CompressorUtilities6499%3.681°6.7k hin 4dWarning

Work Orders

Upcoming Maintenance Schedule

11
Jul
Cement Mill 1Bearing replacement (DE side)
Team Mech-A · 6h
Critical
12
Jul
Kiln 1Refractory inspection + load re-trim
Team Process · 8h
Critical
14
Jul
Air CompressorValve plate + filter service
Team Utilities · 3h
Warning
17
Jul
Raw Mill AGearbox vibration analysis
Team Predictive · 2h
Warning
21
Jul
Chiller Unit 1Condenser tube cleaning (anti-fouling)
Team Utilities · 4h
Warning
28
Jul
Cement Mill 2Routine lubrication + alignment
Team Mech-B · 2h
Routine