Alarm · Full detail
Kiln 1
criticalraisedInfo
Load 108% — 14% above design; MD coincidence risk in 10–11 TOD peak
Raised Tue, 21 Jul, 2026, 9:40 am IST
Severity
critical
Kiln 1
Signal snapshot
| Metric | Value | Context |
|---|---|---|
| Load | 108% | Pyro |
| MTD energy | 412 MWh | Detection rule, Meter readings |
| Power factor | 0.91 | 1860 kVA MD share |
| Raised | 9:40 am IST | 21 Jul 2026 |
What triggered this alarm
Load 108% — 14% above design; MD coincidence risk in 10–11 TOD peak