Alarm · Full detail

Kiln 1

Back to console
criticalraisedInfo

Load 108% — 14% above design; MD coincidence risk in 10–11 TOD peak

Raised Tue, 21 Jul, 2026, 9:40 am IST

Severity

critical

Kiln 1

Signal snapshot

Alarm signal metrics
MetricValueContext
Load108%Pyro
MTD energy412 MWhDetection rule, Meter readings
Power factor0.911860 kVA MD share
Raised9:40 am IST21 Jul 2026
What triggered this alarm

Load 108% — 14% above design; MD coincidence risk in 10–11 TOD peak

Anomaly window

From
Tue, 21 Jul, 2026, 9:30 am IST
To
Tue, 21 Jul, 2026, 11:00 am IST
Summary
Demand 14% above design during 10–11 TOD peak; MD coincidence risk.

Lineage & sources

Rule
rule_md_coincidence_v3
Baseline
bl_kiln_1_7d
Sources
Detection rule, Meter readings, Baseline comparison

Workflow

Asset
Kiln 1
Asset ID
kiln_1
Area
Pyro
Owner
Unassigned
Finding
fnd_4401
Rule
rule md coincidence v3